JSC Nizhny Novgorod Machine Building Plant 2011 annual report :
Shipment
to Algeria (Codename : 012 foreign customer) of three battalions of
S-300 took place as indicated on page 12 of the report as part of the
two divisions contract, and the third division (the second contract)
delivery to Algeria begun in December 2011 and will be fulfilled in
January 2012, said the top manager
[ندعوك للتسجيل في المنتدى أو التعريف بنفسك لمعاينة هذا الرابط]+
توضيح
les 3 divisions (12 bataillons)
A typical S-300 battalion = 6 batteries
A typical S-300 battery = 8 TELs
[ندعوك للتسجيل في المنتدى أو التعريف بنفسك لمعاينة هذا الرابط]